Wednesday, October 20, 2010

Day 7 windows opening


The wooden planks forming the frames for the 3 concrete pillars have been removed.
Two window openings have been created by using wooden rods to support planks nailed together to form support frames for horizontal concrete beams above the window openings.
But before the concrete mix in the horizontal wooden frames can fully set, bricks have been placed on top of them.



For the front that is to be extended, supporting wooden structures have been placed to support horizontal concrete beams that have just been built. The horizontal concrete beams form the top of the main window or door opening that faces the main road.

No comments:

Post a Comment