Friday, October 15, 2010

Day 2 back fence all off


Foundation work being done:
The back fences are all removed. Shallow trenches have been dug where the back fences were. Wooden frames have been built around the shallow trenches and concrete mix poured into them. There are going to be three vertical pillars. Now iron rods were sticking out where these pillars are going to be.

Skip is now here.