Saturday, October 23, 2010

Day 10 Roof tiles up

For the back extension, yesterday the roof rafters were installed. Today metal sheet were put on top of the rafters and then purlins were put on top of the metal sheet.

Then roof tiles were laid. The eaves overhang is the length of one roof tile which juts out into the back lane.

Then only the bricks were laid in a 90degree triangle shape at the top end of the roof tile to form the part of wall next to the roof tiles.


Font and side:

No comments:

Post a Comment