Sunday, November 28, 2010

Day 46 status

1. Why did they cut the plastic and expose the electricity trunk cables?
Got the answer: one of the cables was suspected to be damaged by termite treatment so they cut and took out the cables to check.



2. Connection pipes ready for point-of-entry water filter



3. The floor of the front extension is tiled

No comments:

Post a Comment