Saturday, November 6, 2010

Day 24 Finally rendered

At about 10am, the electrician and air conditioned workers came and drilling work started. From 11 to 11.30, the top portion of the side walls for the back extension was rendered. They just used some wood and built a temporary structure for the worker to stand on while rendering the top. But the inner top wall facing the roof tiles is still not rendered.

A wooden stick - remnants of the temporary wood structure that the worker stood on. I hope they remove it before they paint the wall.

Top portion of the wall rendered.

Inner side of the wall facing the roof tiles not rendered yet.

No comments:

Post a Comment