Saturday, February 26, 2011

Aircon and gatelights



For the past few days, there were some workers working to install aircons and lights. This place is taking its own sweet time to be fully fitted for occupation.

Change gate lights






The round gate lights have been replaced today. The grilles installation have also been completed today with the auto gate system and alarm system.

Friday, February 25, 2011

Putting up grilles

Started putting up grilles and changing the main gate to roller folding gate. Changed the side gate too but did not finish due to heavy rain in the evening.

Saturday, February 19, 2011

Thursday, February 17, 2011

Downpipe

A rectangular downpipe was installed for the MBR balcony roof and was painted to be the same light greenish colour as the walls. One end joins the gutter of the roof of the front porch.
The downpipe for the back roof.

It has a few bends on top of the roof of the back extension and then goes on top of the roof and with one open end in the gutter of the roof of the back extension.

The end of the pipe which will channel the water into the open cutter of the roof of the back extension. The whole configuration is not done very aesthetically.

Close up of the few bends of the down pipe. Hope that the bends do not leak water.

Monday, February 14, 2011

Gutter up

The roof of the MBR balcony has gutter installed all around it but the downpipe has not been installed. There is also a wall fan installed on the wall of the balcony.



Current look of the side of the house.