Monday, January 31, 2011

Pergola framework



Paint work in progress.

Tuesday, January 25, 2011

Install lights



Today lights were installed inside the house and on the wall facing the gate.

Sunday, January 23, 2011

Thursday, January 20, 2011

Greystone wall cladding

On 10 Jan 2011, they were poking holes into the wall (as seen in the left photo below). On 19 Jan 2011, the wall has been cladded with grey stone tiles. A worker is seen putting tiles to the balcony/top of the car porch. In the right photo, two ventilation fans can be seen in the bathrooms.

Wednesday, January 19, 2011

Side awning

The side awning to shade the external kitchen sink was installed today.


Monday, January 10, 2011

Move in then extend


After moving in for about 1.5 year, they are now doing full back extension. As the sand and bricks can't be transferred through the house, they unload the sand and bricks at the end of the back lane thus dirtying the back lane.

As of today, it is about 85% finish.

Blue sheet iron rods


One more house starting renovation today on 5 street. Around 12pm, a blue sheet was spotted covering the ground of the front porch and a bundle of iron rods laying in front of the gate.

Monday, January 3, 2011

Divider removed

Today workers can be seen washing the front porch of the place, cleaning and scraping away the cement residue. Then they removed the blue divider sheet so we have clear view again.

Install clothes bar

They installed two parallel clothes bar on the underside of the metal frame of the awning. Is the metal frame strong enough if 24 wet and heavy clothes like jeans are hung on the clothes bar?