Monday, September 27, 2010

Water feature

Moving in mid of October?

Saturday, September 25, 2010

Instant greens

Plants from nursery in Sungai Buloh

Friday, September 24, 2010

Wednesday, September 22, 2010

Gatelights

Gatelights and wooden boards covering the front of the porch are installed.

Thursday, September 16, 2010

Wooden frames off



Developer clearing grasses

The developer cut and cleared the grasses for all vacant end lots and corner lot houses.

One more moved in!

8 finally moved in today. As for 10, the wooden planks perimeter fencing have been installed.

Wednesday, September 15, 2010

Ceremony

There was a man doing some ceremony with joss sticks and pat kua. Foos are stuck to the doors.


Tuesday, September 14, 2010

Grilles are back

The grilles for the main window in the middle floor have been installed again. I really think the grilles are changed from hollow square tubular iron rods to flat solid iron rods.

Saturday, September 11, 2010

Bits and pieces in

Another air con unit has been installed for the top floor, curtains are up for the middle floor and a stainless steel standalone kitchen unit has been spotted being moved into the back kitchen. Wonder when they will move in.

Thursday, September 9, 2010

Boxed up again

The cake-liked concrete top was boxed up again on all sides with more iron rods put in at the sides. Work has stopped for the Raya holidays.

Wednesday, September 8, 2010

Concrete set

Concrete top for the porch uncovered - looks like a tiered cake now.

Tuesday, September 7, 2010

Concrete truck

1. Iron horizontal frame in
2. Pouring concrete from the concrete truck
3. All concrete in

Monday, September 6, 2010

Iron for frame

1. The iron structures have been put in for the horizontal beams-to-be.

2. Removing more of the existing concrete.


Sunday, September 5, 2010

Sky god altar

The sky god altar was installed in the garden today.

Saturday, September 4, 2010

Complete wood platform

Remove grilles


The grilles were removed from the middle layer windows for alteration?

Friday, September 3, 2010

Wood platform

They built a wood platform frame structure.


Thursday, September 2, 2010

New pillars

A lot of work was done in just one day.

1. The existing pillars can still be seen during the earlier part of the day.

2. Two existing pillars have been demolished and new pillars constructed in the evening.

3. The top end of the two new pillars have been boxed up with wood at the end of the work day.


Wednesday, September 1, 2010

Sept Monthly Status

1 more house started extensive renovation last month (August 2010).

8 has still not moved in. Doing work very slowly, few items since day.

2 houses are doing active renovation:
10, 18

Stats:
Same as last month

17 in out of 27 so 62.96% in.