Made the tree fell down.Thursday, December 31, 2009
Add-ons to gate
Another reno started
Reno started since ? (should be just recently because not much work has been done) on an end lot house.A different way of doing things. Started by destroying the external walls of the wet kitchen. Will they be doing back extension? Normally the back extension will be constructed first and then the existing external wall is then destroyed, not like this.
Wednesday, December 30, 2009
Walling up the indent
Tuesday, December 29, 2009
Cover for cy
Sunday, December 27, 2009
8th in?
Friday, December 25, 2009
Grey bricks up at back
14 starts reno on Xmas day
Bricks then top frame
Thursday, December 24, 2009
8 of 5 started reno
Saturday, December 19, 2009
Another back extension
Friday, December 11, 2009
Iron curtain rings
Got some nice iron curtain rings, 10pieces per pack. I got silver plated ones when there is another colour choice which is black. It is distributed by www.eadeco-online.com and I bought it at Akemi shop in Sunway Pyramid. Forgot how much it is. I think it is about RM9 per pack. I will need to get more packs someday because now I am using the minimal.
Sunday, December 6, 2009
Friday, November 27, 2009
5th to move in
9 moved in today although 12 was already handed over to the family by the contractor on Nov 17. Heard children playing in the evening, really loud. So 5 houses occupied now.
Saturday, November 7, 2009
Friday, October 30, 2009
Wednesday, October 28, 2009
Street 5 status
Still 3 houses occupied - 3, 11, 20. Four houses are actively renovating - 9, 12, CKS, and Cat. Wonder which one of them will move in first. I think it is between 9 and 12 as 12 has installed alarm system and grilles and 9 has changed the colour of the house from yellow/orange to light bluish grey.
Tuesday, September 29, 2009
Monday, September 28, 2009
Curtain or grille?
Sunday, September 20, 2009
2nd and 3rd moved in
Over yesterday Sat and today, 3 and 11 moved in so 3 houses occupied now.
For 3,
From and including: Tuesday, 21 July 2009
To, but not including : Sunday, 20 September 2009
It is 61 days from the start date to the end date, but not including the end date
Or 1 month, 30 days excluding the end date from start reno to move in - really fast.
For 3,
From and including: Tuesday, 21 July 2009
To, but not including : Sunday, 20 September 2009
It is 61 days from the start date to the end date, but not including the end date
Or 1 month, 30 days excluding the end date from start reno to move in - really fast.
Wednesday, September 16, 2009
Street Status
As of 16 Sep 09:
1. 1 family has moved in yesterday (H).
2. At least 3 houses are doing quite extensive renovation:
a) one nearly completed.
b) one taking out all timber flooring.
c) one mixing cement in the porch.
3. 2 more are doing fixtures:
a) installing cabinets.
b) installing lights.
4. An unknown numbers are having their defect lists rectified.
So hopefully by the end of Oct 09, there will be at least 3 households living in this street.
Gate lights installed:



1. 1 family has moved in yesterday (H).
2. At least 3 houses are doing quite extensive renovation:
a) one nearly completed.
b) one taking out all timber flooring.
c) one mixing cement in the porch.
3. 2 more are doing fixtures:
a) installing cabinets.
b) installing lights.
4. An unknown numbers are having their defect lists rectified.
So hopefully by the end of Oct 09, there will be at least 3 households living in this street.
Gate lights installed:



Tuesday, September 15, 2009
Sunday, September 13, 2009
Varnished top floor